1, in the column and beam after installation without setting pressure plate with the pouring floor, in order to facilitate the construction of the column bolt is convenient, need to lay the proper number of store aisle panels, electric welding machine, air compressor, acetylene bottles of equipment used in platform is arranged on the newly installed steel beam in steel beam. Distance from the relevant provisions of safety production. In order to facilitate the construction of ascending, lifting the first climb ladder is fixed on the steel column column, column beam joints and welding for high strength bolts fastening, be installed in the hand foot hanging basket main beam column node.
2 construction of electric machinery and equipment must be grounded, absolutely not allowed to use glass, broken wires and cables, to prevent leakage of equipment. The construction of electrical and electrical equipment and machinery of the cable, must be concentrated together, and with the construction of the floor and by section. Each floor shall be provided with a power distribution box for each floor of the construction of electricity needs. High altitude construction, when the wind speed reached 15m/s, all the work must be stopped. Construction should also pay attention to fire protection, provide the necessary fire fighting equipment and fire protection personnel.