The construction of steel structure workshop is divided into the following five parts
1, embedded (stable structure)
2, columns, generally with H steel, or C steel (usually with angle steel to connect the two C steel)
3, beam, generally with C steel and H steel, (the height of the intermediate product according to the span of the beam)
4: purlin generally used C steel and Z steel.
5, support, brace, usually round.
6, Watts, divided into two kinds, the first is a single tile (Cai Gangwa). The second is the composite board. Two layers of color coated plate sandwiched between polyurethane or rock wool to play the role of cool in summer and warm in winter, but also the effect of sound insulation and fire prevention.